After more than one month of construction, the bridge has been completed at total cost of 250 million VND (9,820 USD), of which 170 million VND by the “Thien Thanh Tam” Club and the remainder by local residents. It is 15.6m long and 4m wide.
The bridge will facilitate the travelling of nearly 120 households, especially students of two school facilities during the flooding season.
On this occasion, the “Thien Thanh Tam” Club presented seven bikes worth a total of 12 million VND to students in difficult circumstances, and 33 packages of gifts to students and residents in Dinh hamlet, each worth 500,000 VND./.
You have 500/500 characters left
Please enter 5 or more characters!!!